The back of this fisherman’s cottage in Coverack Had been left exposed for over ten years .  It had been severely washed out and the sills were pretty shocking. I removed all the loose cob ,replaced the existing sills with good slate ones. I then repaired all the washed out areas .Then gave it two coats of lime render.

The TV cables were buried in the cob to give the finish a less cluttered look.

The TV cables were buried in the cob to give the finish a less cluttered look.

Here you can see the sills removed ready for the new slate.

Here you can see the sills removed ready for the new slate.

Here you can see the cob cleaned off and all loose material removed prior to repair.

Here you can see the cob cleaned off and all loose material removed prior to repair.

specialist lime render to cob

Here you can see the new sills installed into the existing windows.

Lime render to cob cottage

There was a good amount of stone in the cob.

Cornish specialist rendering

The base coat was applied with a trowel as the cob was actually in a good solid state.

lime rendering cob

You can see the Hessian pulled back for the application of the top coat.

Lime render on cob

the top coat was lovely and smooth with pleasant undulations.

Traditional Cornish lime render